susanta.skd


Find All Posts by susanta.skd Click Here


Free Member
Upgrade Now
Free Member

Forum

My topics in SEFI Forum:
0
My posts in SEFI Forum:
0

Academic

Degree
B.TECH
Affiliated to:
WBUT/MAKAUT
Industry Experience
5 Years

Personal

Title
Mr.
First Name
Susanta
Last Name
Kumar Dey

Professional

Professional Experience

I have been working since 2015 in various fields of roadworks.
Some of my completed projects are as follows-
1. Widening & Strengthening of Beliatore-Sonamukhi-Patrasayer-Rasulpur road (SH-8) Portion from 20.000 km to 44.876 km including reconstruction of old damaged cross drainage structure in the District of Bankura, under PWD Bankura Division.
2. Improvement of riding quality at Rasulpur-Kuchut Road from 0.00 km to 8.00 km under the Burdwan South Highway Division in the district of Burdwan.
3. Strengthening of Barasat-Basirhat Road from 41.80 km to 42.60 km by providing 75 mm thick BM & 25 mm thick Mastic work under Barasat Division, PWD.
4. S/R to the Road – Mohispota Auto Stand to Karnamadhabpur Roy para via Mohispota primary school and B R S Brickfield under Bilkanda-I Panchayat under Kolkata North Division, PWD.
5. Widening, Beautification of G.T.Road (Four Lane) from Nawabhat to Ullash More Phase-I, Ch-556.00 km to 559.60 km and 562.00 km to 566.00 km, Burdwan in the Dist. Of Burdwan, West Bengal under Burdwan Division, PWD.
Consultant: LEA ASSOCIATES SOUTH ASIA PVT. LTD.
6. Strengthening and improvement of Berhampore-Kandi-Sultanpur Road (SH-11) from 37.50 Km to 50.30 Km under Berhampore Division No-1, PWD in the district of Murshidabad.
Consultant: RODIC CONSULTANTS PVT. LTD.
7. Improvement of riding quality program of Champadanga-Pursurah-Arambagh Road from 0.00 Kmp to 20.00 Kmp under Hooghly Construction Division, PWD.
8. Construction of 2 No Rapid Exit taxiway (RET) for the main runway 07/25 and Straightening of B-taxiway as Parallel Taxi Track for E-Aircraft at Chennai International Airport, Chennai (Civil Works).
Client: Airport Authority of India, Chennai.
9. Construction of Link Parallel Taxi Track (Phase-II) and Grading of Basic Strip at South Side of Mangalore International Airport.
Client: Airport Authority of India, Mangalore.
10. Present Company: Sinclus Engineering & Consulting Pvt Ltd.
Working for: Bangalore International Airport Limited (BIAL).
Position: QC Engineer.

History

Member for
8 weeks 5 days