thirumalaichettiar Silver Sponsor
Joined: 26 Jan 2003 Posts: 3554
|
Posted: Tue Nov 20, 2012 5:13 pm Post subject: Post that appeared in General discussion. |
|
|
http://www.sefindia.org/forum/viewtopic.php?p=52567#52567
In the above link Er. K.Gangadharan has posted some important aspect on Pumping of concrete for Tall buildings with a quote from S.A.Reddy the ex Joint Managing Director of Gammon India Ltd.
Moderators have to take note of it and need a response from experts.
T.RangaRajan. |
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Tue Nov 27, 2012 10:20 am Post subject: Raising ready mix concrete to higher levels supplementary di |
|
|
Raising ready mix concrete to higher levels supplementary discussion
Dear Eng Gangadharan Ji
http://www.sefindia.org/forum/viewtopic.php?t=13130
I agree with concern you raised, which is extremely, significant from engineering view point
- All materials can be raised to higher levels with exception of concrete
- Concrete causes issues to be contemplated requiring site thought & pre scheme to handle concrete transport issues
- Moreover, heavy power pumps are certainly, required to effect transportation
- Yet, pump alone would not resolve transport issue
- Normally, in general cases, concrete is transported to locations either using mobile pumps or like in old years in 80s, stationary reciprocating pump were used to do so
- Up to 100 m heights, higher capacity mobile pumps could be used for concrete placement, duly professionally managed
- Higher elevations do not permit such systems due to fact of weight of concrete in pump boom as well as, weight of boom itself
- Extra mechanical system may be required to help concrete raised to further heights as you rightly stated
- 1400 hp pump was employed on Burge
- It was used based on site mock up testing as well as, one standby also, used
- Foregoing links explains general requirement in such cases of transporting concrete
- No direct route should be designed for concrete movement to avoid stresses in vertical or in boom position
- Route requires to be deviated many time allowing passing through many penetrations & bend, so as in case of emergency, intermediate controls can be operated
- HPC shall certainly be required in every case, while additional intermediate stations would also, be required for further heights
_________________ Thanks & Warm Regards
IntPE(India)Suraj Singh FIE Civil
Engineering & Arbitration
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
|
|
|