|
View previous topic :: View next topic |
Author |
Message |
rajesh_reddy SEFI Member
Joined: 19 Mar 2019 Posts: 1
|
Posted: Mon Aug 05, 2019 7:08 am Post subject: Formwork Design |
|
|
Dear Sir,
For the design of temporary formwork for deck slab should we consider Earthquake Loads, if to be considered please provide with some literature as per IRC standerds.
Description
For Flyover 6 x 40m span with Steel Composite Girder, Formwork to be designed for Concrete Deck Slab. This Flyover is located in Zone V, Substructure construction is done and Steel Girders are also placed in position.
Falsework items used are Plywood, Wooden Runners, ISMC, Acrow span, ISMB, Vertical Cuplocks, MS Cribs.
with regards,
K Rajesh. |
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You can attach files in this forum You can download files in this forum
|
|
|
|