Concrete Block Foundation :
Despite many advantages discussed in previous posting , the excavation of block is time consuming as it is to be done manually so that side soil is not disturbed . Also block size need to be at least 900x900 mm or higher for manual working excavating.
In case JCB is used for excavation , side shuttering / 4.5" brick wall is needed before concreting. Also in such situation side backfill around block needs compaction .
But still is an economical and faster when compared to conventional spread footing with top and bottom meshes concreting first and pedestal concreting afterwards. |
|
Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
|
|
|