Posted: Wed Aug 17, 2022 9:47 am Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
World
Buildings Practice Facilities Plants / Petrochemicals Onshore
Construction
Chapter 10
https://www.facebook.com/pesuraj/posts/pfbid0214iDMbMkaeeD7eitVp1DbVPKYH6uy9N4bu2HPzDmrdoX1dq4poAbmtRP6eTW2wD7l Part 16
https://www.facebook.com/pesuraj/posts/pfbid0quQNaNw6Du6rA3reHU2hEYxXos3cdaHoNJPASvWpV1dAx3uo6Pj6Gd6tZdTioNv8l Part 15
https://www.facebook.com/pesuraj/posts/pfbid02CJFwjUU5PqHhYmjYjTXHtAWRqp6CBMPY24abo6Ny4tgkfnsCecyYmfy5mnHSoeu6l Part 14
https://www.facebook.com/pesuraj/posts/pfbid02dEdubcBEikDVcizKvsducXzLWpDCJFvx2SgTPZsWbzvJC6D1wvXeYiVHPiF738u2l Part 13
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Wed Aug 17, 2022 9:58 am Post subject: Field Engineering Building+GeneralRERA |
|
|
Field Engineering Building+GeneralRERA
Cost Certification Support Procedure in Excel Format
This is an indicative format just to apprise, how cost controls could be impressed upon promoters, including minute activities details in a valuation world
This has been based on experience in Valuation on Projects discipline
Many of Engineers should be having an adequate experience & expertise in this discipline
RERA does not specify any procedures
We require to control sites & their costings, to avoid any planned scams
I require suggestions from you
This file shall be sent to all leading Scheduled Banks for purpose of its uniform implementation
This file constitutes 20 levels, but can be used for all levels
Whole project requires detailed cost analysis
All disciplines, normally are calculated, depending on values of quantities
This worksheet is supportive page for gross data that can be obtained from separate details on other sheets
All components quantification requires to be done in details
All item rates require to be worked out, depending on market rates respecting material, workforce, equipment, sundries & overheads
All these unit rates worked out should be used to multiply quantities obtained in each case
Cost as obtained by this exercise should then be linked to cost column
This cost requires to be made in agreement with Promoter's professionals for indicative use to avoid dispute & once agreed, there shall be no change, without consent
Land cost should be imported from records
Expenses on all approvals should be imported from records
Planned % must be agreed on bar chart schedule in beginning, per allotted budget in line to quantities
Earned % shall be measured from site
Status means whether achievement is negative, on line or positive
Withdrawal sum each item to be worked out
All such sums to be added
Land parameters to be added
Approval parameters to be added
Withdrawal sum is obtained each month & continued every month
All details are projected month wise & used for comparison on project, whether or not progress is in line or measures are required
Clear concept is required
An experienced Chartered Engineer (India) can operate this format successfully
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses. Use online scanners here and here to upload downloaded attachment to check for safety.
|
Description: |
Engineer Defined in RERA Act |
|
Download |
Filename: |
REREDefinition Engineer.docx |
Filesize: |
18.79 KB |
Downloaded: |
83 Time(s) |
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses. Use online scanners here and here to upload downloaded attachment to check for safety.
|
Description: |
|
Download |
Filename: |
RERACosting.docx |
Filesize: |
12.85 KB |
Downloaded: |
62 Time(s) |
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses. Use online scanners here and here to upload downloaded attachment to check for safety.
|
Description: |
|
Download |
Filename: |
RERA Costing.docx |
Filesize: |
11.5 KB |
Downloaded: |
54 Time(s) |
Warning: Make sure you scan the downloaded attachment with updated antivirus tools before opening them. They may contain viruses. Use online scanners here and here to upload downloaded attachment to check for safety.
|
Description: |
|
Download |
Filename: |
RERA Work Percentage Cost Format25.9.2018.xlsx |
Filesize: |
186.05 KB |
Downloaded: |
66 Time(s) |
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Wed Aug 17, 2022 11:47 pm Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
01 Hour/s 45 Minutes Videos-ScreenShare
18.08.2022- Reliable Engineers+ Article51A+Works (Quality+Coordination+Communication)+ Engineering Order Must+ Designs+ EPC Contracts+ Specifications Methods+Disputes+ What To Do? Talk 849
https://www.facebook.com/100000185425294/videos/761690145095727
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Thu Aug 18, 2022 10:58 am Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
World
Buildings Practice Facilities Plants / Petrochemicals Onshore
Construction
Chapter 10
https://www.facebook.com/pesuraj/posts/pfbid0Syt3Ba4yw3f29bJQMRX3EPGyyzvXhkj8udUgxf8re9KMzjsGAKjETnsaRkzA9YNNl Part 20
https://www.facebook.com/pesuraj/posts/pfbid0NEZZ8eP9WcVPd55pGsA97sKkNATXhkeVmo45hTk2XhSEge8qFQ6sXGJCHbNWp7YEl Part 19
https://www.facebook.com/pesuraj/posts/pfbid02qcFtsopWiXeNuzVHNfL9aAuj9gB35YrF2JuwqT4pUTx1oAXQd3yRNswtpu4yRYZLl Part 18
https://www.facebook.com/pesuraj/posts/pfbid0RZRjAZF91ZuRnU6XuTNhaycapABdEU3QW5mbPK6daectdy2hoTK4H9SijwakzucGl Part 17
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Thu Aug 18, 2022 11:51 pm Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
01 Hour/s 30 Minutes Videos-ScreenShare
19.08.2022- Reliable Engineers+ Article51A+Works (Quality+Coordination+Communication)+ Engineering Order Must+ Designs+ EPC Contracts+ Specifications Methods+Disputes+ What To Do? Talk 850
https://www.facebook.com/100000185425294/videos/806049160414236
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Fri Aug 19, 2022 12:56 pm Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
World
Buildings Practice Facilities Plants / Petrochemicals Onshore
Construction
Chapter 10
https://www.facebook.com/pesuraj/posts/pfbid0dGc5hRDkDuFRvVvLzXHo7UQ6gNmt4bePHSFDq5YbTNAjksWcW9xNQGiTh5breZBkl Part 24
https://www.facebook.com/pesuraj/posts/pfbid034Fc1HC9LQ1HKSRueP6G33qu6h4UMokfgEEZNvqLg3pjbBdxZbAzFqphofXoB1tW2l Part 23
https://www.facebook.com/pesuraj/posts/pfbid0jVeuFSNfQoKcVqg5SY6mqsmVYAEtVo8qUsdTYFm35NK9UN9nKpkfgcHTJWn9UGfKl Part 22
https://www.facebook.com/pesuraj/posts/pfbid02zNxarJevjrCvSCmZbRQ5AT2VdnnT61McdoAY2m6KEFntaZ61NMWq8GNTND1sK3bVl Part 21
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Fri Aug 19, 2022 11:59 pm Post subject: Field Engineering Building+General+FIDIC-QualityContracts+Engineering discipline |
|
|
01 Hour/s 40 Minutes Videos-ScreenShare
20.08.2022- Reliable Engineers+ Article51A+Works (Quality+Coordination+Communication)+ Engineering Order Must+ Designs+ EPC Contracts+ Specifications Methods+Disputes+ What To Do? Talk 851
https://www.facebook.com/100000185425294/videos/748573553093776
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Sat Aug 20, 2022 9:48 am Post subject: Field Engineering Building+BookPlans |
|
|
World
Book Plans- Buildings
Plan 3
Bharat Mata in Hindi
https://www.facebook.com/photo/?fbid=6156175681065218&set=a.101263476556499
Book Plans- Buildings
Plan 2
AL-LAH UH AKBAR
https://www.facebook.com/photo/?fbid=6156161721066614&set=a.101263476556499
Book Plans- Buildings
Plane 1
Hotel Aeroplane
https://www.facebook.com/photo/?fbid=6156150151067771&set=a.101263476556499
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Sat Aug 20, 2022 10:24 am Post subject: Field Engineering Building+Book Plans |
|
|
Corrected Sequence
World
Book Plans- Buildings
Plan 4
Bharat Mata in Hindi
https://www.facebook.com/photo/?fbid=6156175681065218&set=a.101263476556499
Book Plans- Buildings
Plan 3
AUM NAMO
https://www.facebook.com/photo/?fbid=6156170304399089&set=a.101263476556499
Book Plans- Buildings
Plan 2
AL-LAH UH AKBAR
https://www.facebook.com/photo/?fbid=6156161721066614&set=a.101263476556499
Book Plans- Buildings
Plane 1
Hotel Aeroplane
https://www.facebook.com/photo/?fbid=6156150151067771&set=a.101263476556499
|
|
Back to top |
|
|
suraj General Sponsor
Joined: 17 Apr 2008 Posts: 5744 Location: NCR Faridabad, E mail suraj_engineer@yahoo.co.uk
|
Posted: Sat Aug 20, 2022 11:57 pm Post subject: Field Engineering FacilitiesPetrochemicals+General+Concrete+Quality+Coordination+Engineering discipline |
|
|
02 Hour/s 00 Minutes Videos-ScreenShare
21.08.2022- Reliable Engineers+ Article51A+Works (Quality+Coordination+Communication)+ Engineering Order Must+ Designs+ EPC Contracts+ Specifications Methods+Disputes+ What To Do? Talk 852